| Cabrillo Community
College District |
| Bid Summary Sheet |
| Allied Health
Building Complex-Final |
| Date: 3/27/08 |
|
| Contractor's Name |
|
Amaroso |
|
Bobo Construction |
|
Zovich Construction |
|
Bogard |
|
Soltek Pacific |
|
|
|
Bid Withdrawn |
|
| Required
Bid Documents |
|
Contractor A |
|
Contractor B |
|
Contractor C |
|
Contractor D |
|
Contractor E |
| Bid
Proposal |
|
x |
|
x |
|
x |
|
x |
|
x |
| Addendum #1-6 Acknowledged |
|
x |
|
x |
|
x |
|
x |
|
x |
| Bid Bond |
|
x |
|
x |
|
x |
|
x |
|
x |
| Sub-Contractor List |
|
x |
|
x |
|
x |
|
x |
|
x |
| Statement of Qualifications |
|
x |
|
x |
|
x |
|
x |
|
x |
| Non Collusion Affidavit |
|
x |
|
x |
|
x |
|
x |
|
x |
|
|
| Bid Amounts |
|
| The District has
chosen which alternates to accept. |
|
|
| Base Bid |
|
$19,147,000.00 |
|
$12,520,168.00 |
|
$19,400,000.00 |
|
$18,671,000.00 |
|
$18,547,000.00 |
| Lighting |
|
| Ded.
Alternate 1 |
|
$6,000.00 |
|
$7,000.00 |
|
$23,000.00 |
|
$7,398.00 |
|
$7,000.00 |
| Paratransit |
|
| Ded.
Alternate 2 |
|
$48,000.00 |
|
$16,500.00 |
|
$30,000.00 |
|
$15,854.00 |
|
$43,000.00 |
| Column Fins |
|
| Ded.
Alternate 3 |
|
$26,000.00 |
|
$25,000.00 |
|
$10,000.00 |
|
$10,569.00 |
|
$25,000.00 |
| Rail
System |
|
| Ded.
Alternate 4 |
|
$38,000.00 |
|
$1,000.00 |
|
$2,000.00 |
|
$13,370.00 |
|
$32,000.00 |
| Ceiling |
|
| Ded.
Alternate 5 |
|
$15,000.00 |
|
$26,500.00 |
|
$10,000.00 |
|
$55,743.00 |
|
$25,000.00 |
| Doors |
|
| Ded.
Alternate 6 |
|
$3,000.00 |
|
$1,400.00 |
|
$2,000.00 |
|
$9,628.00 |
|
$0.00 |
| Stair
Wall |
|
| Ded.
Alternate 7 |
|
$42,000.00 |
|
$17,000.00 |
|
$30,000.00 |
|
$13,740.00 |
|
$31,000.00 |
| Parking
Lot J |
|
| Ded.
Alternate 8 |
|
$109,000.00 |
|
$150,500.00 |
|
$140,000.00 |
|
$175,945.00 |
|
$170,000.00 |
| Pathway |
|
| Ded.
Alternate 9 |
|
$141,000.00 |
|
$61,000.00 |
|
$30,000.00 |
|
$126,365.00 |
|
$144,000.00 |
| Air
Conditioning Add to project |
|
| Add.
Alternate 1 |
|
$253,000.00 |
|
$244,000.00 |
|
$275,000.00 |
|
$346,189.00 |
|
$240,000.00 |
|
|
| Summary Of Bids |
|
| Base Bid |
|
$19,147,000.00 |
|
$12,520,168.00 |
|
$19,400,000.00 |
|
$18,671,000.00 |
|
$18,547,000.00 |
|
|
|
|
|
|
|
|
|
|
|
| Total
Base Bid + All Accepted Alternates |
|
$19,082,000.00 |
|
$12,510,668.00 |
# |
$19,465,000.00 |
# |
$18,690,570.00 |
|
$18,417,000.00 |
| Shaded
Items were not removed from the project scope. The
dollars shown are not reflected in the totals. |
|
|
|
|
|
|
| Deductive Alternate # 1 |
Eliminate pendant
lighting fixture in the hallway |
| Deductive Alternate # 2 |
Eliminate Paratransit
Canopy |
| Deductive Alternate # 3 |
Eliminate decorative
column fins |
| Deductive Alternate # 4 |
Change the stair
railing system in main lobby from cable to circular tube steel |
| Deductive Alternate # 5 |
Eliminate acoustical
ceiling clouds and replace with standard acoustical ceiling system |
| Deductive Alternate # 6 |
Change all interior
wood veneer doors with paint grade doors |
| Deductive Alternate # 7 |
Eliminate free
standing privacy wall on stairs by dental clinic |
| Deductive Alternate # 8 |
Eliminate ADA parking
Lot J Scope |
| Deductive Alternate # 9 |
Eliminate ADA
Path from Soquel Drive to Parking lot
J |
| Add Alternate # 1 |
Add air conditioning
to the three fitness rooms |
|
|
|
|
|
|
|
|
|
|
|