Cabrillo Community College District
Bid Summary Sheet
Allied Health Building Complex-Final
Date: 3/27/08
Contractor's Name Amaroso Bobo Construction Zovich Construction Bogard  Soltek Pacific
Bid Withdrawn
Required Bid Documents Contractor A Contractor B Contractor C Contractor D Contractor E
Bid Proposal   x   x   x   x   x
Addendum #1-6 Acknowledged   x   x   x   x   x
Bid Bond   x   x   x   x   x
Sub-Contractor List   x   x   x   x   x
Statement of Qualifications   x   x   x   x   x
Non Collusion Affidavit   x   x   x   x   x
Bid Amounts
The District has chosen which alternates to accept. 
Base Bid $19,147,000.00 $12,520,168.00 $19,400,000.00 $18,671,000.00 $18,547,000.00
Lighting  
Ded. Alternate   1   $6,000.00   $7,000.00   $23,000.00   $7,398.00   $7,000.00
Paratransit   
Ded. Alternate   2   $48,000.00   $16,500.00   $30,000.00   $15,854.00   $43,000.00
Column Fins 
Ded. Alternate   3 $26,000.00 $25,000.00 $10,000.00 $10,569.00 $25,000.00
Rail System  
Ded. Alternate   4   $38,000.00   $1,000.00   $2,000.00   $13,370.00   $32,000.00
Ceiling  
Ded. Alternate   5   $15,000.00   $26,500.00   $10,000.00   $55,743.00   $25,000.00
Doors  
Ded. Alternate   6   $3,000.00   $1,400.00   $2,000.00   $9,628.00   $0.00
Stair Wall
Ded. Alternate   7 $42,000.00 $17,000.00 $30,000.00 $13,740.00 $31,000.00
Parking Lot J
Ded. Alternate   8 $109,000.00 $150,500.00 $140,000.00 $175,945.00 $170,000.00
Pathway
Ded. Alternate   9 $141,000.00 $61,000.00 $30,000.00 $126,365.00 $144,000.00
Air Conditioning Add to project
Add. Alternate   1 $253,000.00 $244,000.00 $275,000.00 $346,189.00 $240,000.00
Summary Of Bids
Base Bid $19,147,000.00 $12,520,168.00 $19,400,000.00 $18,671,000.00 $18,547,000.00
Total Base Bid +  All Accepted Alternates $19,082,000.00 $12,510,668.00 # $19,465,000.00 # $18,690,570.00   $18,417,000.00
Shaded Items were not removed from the project scope. The dollars shown are not reflected in the totals. 
 
       
Deductive Alternate # 1 Eliminate pendant lighting fixture in the hallway
Deductive Alternate # 2 Eliminate Paratransit Canopy
Deductive Alternate # 3 Eliminate decorative column fins
Deductive Alternate # 4 Change the stair railing system in main lobby from cable to circular tube steel
Deductive Alternate # 5 Eliminate acoustical ceiling clouds and replace with standard acoustical ceiling system
Deductive Alternate # 6 Change all interior wood veneer doors with paint grade doors
Deductive Alternate # 7 Eliminate free standing privacy wall on stairs by dental clinic
Deductive Alternate # 8 Eliminate ADA parking Lot J Scope
Deductive Alternate # 9 Eliminate ADA Path from Soquel Drive  to Parking lot J 
Add Alternate # 1 Add air conditioning to the three fitness rooms