Skip to Site Navigation | Skip to Local Navigation | Skip to Content

Space Planning and Reallocation Project
Aptos Campus

Project Manager:  Paul Anderson
Phone:   831.479.5086

Project Coordinator: Susan Robinson
Phone:   831.479.5095

 

Architect:  bfgc, Inc.
Project Manager:  Patty Lock
Phone:   408.924-0811

Architectural Drawings

Click on the links below to view the drawings.  Note:  these large files may take a few minutes to load.

February 6, 2009 Concept III
December 16, 2008 Concept II

Buildings 100, 200 and SAC

Overall site plan, building 100, 200, SAC
Buildings 300, 350, 400, 450, 500, 600, 700, and 800 Bldgs 300, 350, 400, 450, 500
Buildings 900 and 1000 Bldg 600, 700, 800, 900
Buildings 1100, 1170, 1190, 1200, 1300, 1400, 1500, 1600, and 1700 Bldgs 1100, 1170, 1190, 1200, 1300, 1400, 1500, 1600, 1700
Buildings 1800, 2000, 2030, 2100, 2500, 2550, 2600, Allied Health and AEC. Bldg 1800, 2000, 2030, 2100ABC, 2500, 2550, 2600, Allied Health, VAPA

Complete Space Allocation Plan III
October 22, 2008 in Black & White

Complete Space Allocation Plan II
December 16, 2008 in Black & White

    Was this page helpful?    
Blackboard Online Learning System WebAdvisor  iTunes Cabrillo Library Facebook Icon Twitter Icon YouTube

© 2013 Cabrillo Community College District

Campus Safety | Accessibility

Main Campus, 6500 Soquel Drive Aptos CA 95003, 831.479.6100